This study focuses on seven at-grade crossings along CSX Transportation’s Richmond, Fredericksburg, and Potomac Rail Line, located between Vaughan Road/Henry Street and Ashcake Road within the Town of Ashland. The seven rail crossing areas are located at:

  1. W Vaughan Road/Archie Cannon Drive
  2. W Patrick Street
  3. College Avenue/Henry Clay Road
  4. England Street
  5. Myrtle Street
  6. Francis Street
  7. Ashcake Road

Map of Study Crossings

at-grade crossing study area map

The purpose of the study is to develop potential solutions to improve safety and efficiency at the identified study intersections. These potential solutions fall into three categories:

  • Improved barriers, pavement markings, and signage
  • Traffic Signalization
  • Grade separation

Project Timeline

planned
planned

Online Survey (Jan-Feb 2026)

planned
planned

Public Open House (April 29, 2026)

Wednesday, April 29th from 5:30-7:30 PM
Ashland Town Hall (121 Thompson St)
No formal presentation; come and go as your schedule allows

planned
planned

Publication of Summary Report & Recommendations (Aug-Sep 2026))